Civil Engineering MCQ Quiz Hub

R.C.C. Structure Designs MCQ

Choose a topic to test your knowledge and improve your Civil Engineering skills

1. In a reinforced concrete retaining wall, a shear key is provided, if the




2. Which of the following has high tensile strength?




3. In a R.C. beam main reinforcement consists of 16 mm bars and coarse aggregate size used in 20 mm. The horizontal distance between two parallel reinforcing bars should not be less than




4. In a R.C. beam beam shear reinforcement should be always in the form of




5. In the working stress method of R.C.C. design which one of the following is correct?




6. Which one of the following is not the diameter of the market form of reinforcing bars?




7. M 75 concrete is regarded as




8. Snow load need not be considered in the design of structures in cold regions, if slope of the root is more than




9. If Fe 415 steel bars are used as tensile reinforcement, minimum percentage of steel to be used is




10. In the working stress method of R.C.C. design factor of safety used for concrete and steel are respectively




11. The maximum spacing of vertical shear reinforcement for a beam of size 250 x 360 mm is




12. Which one of the following statement is not correct regarding the torsional reinforcements to be provided in a slab with two adjustment edges discontinuous?




13. The width of stairs in a residential building should be at least




14. In cantilever retaining walls




15. M 45 concrete is regarded as




16. Characteristic load means




17. Pick up the incorrect statement A : Standard hooks are provided in plain bars. B : Standard bends are provided in high yield bars. C : Standard hook or bend is provided in plain bars.




18. The maximum area of tensile reinforcement to be used in a beam is to be restricted to




19. IS 456-2000 recommends that the unsupported length of any column should not exceed _____ times the least lateral dimension of the column.




20. Which one of the following statement is not correct about curtailment of positive reinforcement in a continuous member?




21. Spacing of longitudinal bars measured along the periphery of R.C. column shall not exceed




22. The depth of footing required for an isolated column depends upon




23. Which one of the following is the correct statement about R.C. retaining wall




24. Which one of the following is not a post tensioning method?




25. Advantage of prestressed concrete member over equivalent strength R.C.C. member is




26. For water retaining structures, minimum grade of concrete to be used is




27. In the stem of counterfort retaining wall main reinforcements are




28. High carbon content in the steel causes




29. In a public building ideal tread is